The National Control Center is at the top of the hierarchy of Control Centers with inter‐computer links provided to the four regional control centers in the central, eastern, western & southern regions. The Center will be linked to the GCCIA control center at the clients Ghunan substation.
ECEC’s scope for the National Control center (NCC) was to provide comprehensive engineering services to construct a Tier III Control Center facility located in Riyadh, Saudi Arabia. The building consists of three floors; Basement, Ground, First and Second floor, with a total buildable area of 9,965 square meter.
Al Khobar
Hotels
Construction Supervision
Land Area: Land Area: 11050 m2 Completion Date: Ongoing
Learn More -Riyadh, Saudi Arabia
Office Building, Commercial
Design Engineering
Land Area: 4,066.9 m2
Ongoing
Learn More -Tabuk, Saudi Arabia
Commercial
Design Engineering
Land Area: 28,000 sqm
November 2021
Learn More -Riyadh, Saudi Arabia
Hospitality
Interior Design
Land Area: 5,000 sqm
December 2021
Learn More -Saudi Arabia, Multiple Locations
Commercial
Design Engineering
Construction Supervision
Ongoing
Learn More -